Interview Questions on Jira
1.
What is backlog ?
Ans:
A backlog is a list of the outstanding user stories, bugs and
features for a product or sprint.
2.
What is Burndown chart ?
Ans:
A burndown chart shows the actual and estimated amount of work to be
done in a sprint.
The
horizontal x-axis in a burndown chart indicates time and vertical
y-axis indicates cards.
3.
What is control chart ?
Ans:
A control chart can show the cycle time or lead time of your product,
version or sprint. The horizontal x-axis in a control chart indicates
time and the vertical y-axis indicates the number of days issues have
spent in those statuses.
4.
What is cumulative flow diagram ?
Ans:
A cumulative flow diagram is an area chart that shows the various
statuses of work items for a
particular
time interval.
5.
What is cycle time ?
Ans:
cycle time is the time spent working on an issue.
Click on below link for Devops Interview QA book:
https://amzn.to/2YsiZah
Click on below link for Devops Interview QA book:
https://amzn.to/2YsiZah
6.
What is epic ?
Ans:
An epic captures a large body of work.
7.
What is kanban ?
Ans:
Kanban is a system for visualizing the flow of work and limiting work
in progress. Kanban allows a team to reduce waste and focus on
delivering customer value.
8.
What is kanban board ?
Ans:
A kanban board is a board that was created using either the “kanban”
preset or the “DIY” option.
9.
What is lead time ?
Ans:
lead time is the time taken from when an issue is logged until work
is completed on that issue.
10.
What is product backlog ?
Ans:
A product backlog is a high level list of customer requirements for
the project that is owned by the product owner /manager